| References |
| |
|
|
|
Haynes and Boone Law Firm
Installation of a 1400 node (WAN) wide area
network in five cities using category 5 technology and fiber optic riser
cabling. This job was completed on time within four months. |
| |
|
|
 |
|
US
Sprint
Installation of over 2000 PBX stations and 2000
data terminals in eight months. Installation of fiber optic backbone for three
office complexes and furnishing of technical staff for daily operations until
U.S. Sprint could hire and train their own technicians. |
| |
|
|
 |
|
Capstead
Installation of a 290 node category 5 network with
fiber optic backbone in the corporate offices. Installation of a fiber backbone
to two floors and installation of category 5 cables to offices on the
horizontal wiring side. Movement of the MIS department with out interruption of
service. |
| |
|
|
 |
|
Hughes and Luce
Installation of a 383 node category 5 network with
fiber optic backbone. Installation of a fiber backbone to four floors and
installation of category 5 cables to offices on the horizontal wiring side.
Termination of telephone cables onto duplex voice and data jacks. |
| |
|
|
 |
|
Brinks Home Security
The complete re-wiring of computer and telephone
network on an IBM AS 400. Brinks' 24 hour service of over 800 thousand
subscribers was never interrupted. Conversion of NEC 2400 and Siemens Saturn
PBX's to Northern Telecom Meridian PBX. The recabling and movement of IBM
Series I, IBM System 38 and two IBM AS 400s without loss of service. This job
was completed with a savings of nearly $100,000 over manufacturer/vender
bids. |
| |
|
|
 |
|
CompUSA, L.L.E and Tritel Corporation
The designs and installations of riser and tie
cabling systems for the Crescent retail complex in Dallas, the Addison Tower
(CompUSA Corporate Office) and the L.L. & E. thirty-nine story office tower
in New Orleans. All projects completed on time. All projects were furnished
with complete set of cabling plans and wiring diagrams. |
| |
|
|
 |
|
Merit
Technologies
The installation of the new Tandem computer center
at Park Central. This project consisted of 1600 locations of voice, main frame
data, LAN data and video. The offices were on separate floors and in separate
buildings at Park Central. Telephone trunk cable, fiber optic and coaxial
cables were installed over a 1500 foot distance of offices and exterior to
connect the two buildings. |
| |
|
|
| Kelly,
Hart & Hallman |
|
Kelly, Hart & Hallman
Installation and conversion of a 336 user ARC-Net
to category 5 10BaseT within four weeks without interruption to a single node.
Dallas and Austin offices. |
| |
|
|
| Campbells Soup |
|
Campbells Corporation
The installation of fiber token ring networks for
Campbells Soup in Paris. This project consisted of the conversion of one large
copper token ring network into five separate fiber rings using Bay Networks
hubs and token ring switches. The Cambells plant in Paris is 43 acres under 1
roof and has 26 different hub locations over two miles of fiber optic.
|