Dana and Matt's Garage - Pictorial
| The back wall was completed before Christmas. Right after the start of the new year the northeast side was started. |
![]() |
![]() |
This is the northeast side, the side where the neighbor dogs tend to bark and bark. They will no longer have a view to the street through our back yard, and this will hopefully curb their barking some. |
| Two sides are done. Hurray! | ![]() |
![]() |
This concrete footing and another like it farther to the left, is what will support the front of the office overhang. Its about fourteen feet deep and should withstand someone driving into it with no problem. This is not a precaution that is without precedence as we did have a car drive into our house one afternoon, and our neighbor had someone drive into his back yard twice. Just your typical 'living in the hood' fortification. |
| The side near the front of the house not only protects the bedrooms, but also creates a small area for either storage, or a potential dog run/enclosure area. We have limited space, so we must take advantage of any useable area. | ![]() |
All photos by danadesigns